History In The Making


May 26th, 2015
Front yard mulched

December 27
Emulsion text with 400w HPS (vs MH)

December 26
Firepit in the backyard rebuilt

December 25
First Christmas

December 24
Shower adapter for screen cleaning.

December 23
xmas shopping

December 22
Workshop setup in final format (ha)

December 21
Xmas shopping

December 20
Gunnar Shirt run

December 19
Making treats for everyones

December 18
Tree Decorating

December 17
Tree Decorating

December 16
Coated all screens for whatever fun project is next.

December 15
screens reclaimed, roughened, degreased.

December 14
Final Emulsion.

December 13
New screens 160 mesh

December 12
Silkscreen drying rack

December 11
Emulsion calculations take 2

December 10
Emulsion calculations take 1

December 9
Screen cleaning and degreasing.

December 8
Emulsion area setup. light modified. whee!

December 7
Reorganized storage area. rearranged room . bleh

December 6
Closet table, un-closet'ed *boggle*

December 5
Firepit area cleanup

December 4
Dryer cleanout.. holy lintball from hell. quote from roger 'oh! I felt that!'

December 3
dehumidifier leak fixed

December 2
visual project started..

December 1
More random shelves in garage.

November 30
All boots waterproofed :)

November 29
Calculated insulation needed for garage insulation.

November 28
Prepping radial arm table.

November 27
First thanksgiving! :)
I am thankful that Barbara finally has a place to call home.

November 26
Snow Snow Snow! :)

November 25
Total tree cleanup!

November 24
Tree Day!

November 23
Silkscreen frames made.

November 22
Radial Arm Saw Day!

November 21
'final' lawn cleanup (please,please,please).

November 20
Printer stand completed.

November 19
SilkScreen setup.

November 18
Sealed basement workshop windows.

November 17
Leaf Cleanup.

November 16
Gas Blower Day 2. All is fine

November 15
Gas Blower. Day 1

November 14
Snow! Again! no accumulation

November 13
Drafting new firepit from existing firepit stones and bricks, plus stuff left over from from walkway.

November 12
Laser Printer arrived (HP 2550N). attempting to build stand

November 11
Brush Day Part 2! aka, cleanin up the stuff they refused to take.

November 10
Brush Day

November 9
Insulated the pipes. Windows next

November 8
Backyard completed

November 7
Snow! if only short lived!

November 6
Added missing parts to radial arm

November 5
gutters, spot raking

November 4
Wood cut up for brush day

November 3
Pit Mess from back yard

November 2
Last backyard rake and mow.

November 1
Rake all of back yard

October 31
Shelves in shed.

October 30
Halloween! 28 in all!

October 29
Trimmed bushes/branches.

October 28
Weatherproof part B

October 27
Removed electric fence

October 26
Leaves

October 25
Gutters, weeding. Washed windows (not fun)

October 24
Halloween prep

October 23
Weatherproofing part A

October 22
Leaves.

October 21
Weeding/gardening.

October 20
tree trimming, minor.

October 19
Leaves

October 18
storage/inventory. Basement cleanout

October 17
tried new gutter attachment.. Awesome!

October 16
wrote inventory system

October 15
David Died

October 14
Original homeowner stopped by for a visit

October 13
Pappy, Gary, Danny, Deb visited

October 12
Bulk items out. wood, drywall, shelves, cabinets, lighting.

October 11
Downstairs bedrooms done.

October 10
Dresser - 4th coat poly

October 9
Dresser - finish
Drywalled sink area

October 8
Dresser

October 7
Dresser

October 6
Dresser - Prep

October 5
Cabinet - finished (needs 3 days cure)

October 4
Cabinet

October 3
Cabinet

October 2
Cabinet

October 1
Cabinet - patched, sanded, bottom fixed.

September 30
Cabinet - patched, sanded, bottom fixed.
backs of doors painted.
September 29
plumber - double backflow valve.
cabinet apart, stripped of parts. cleaned

September 28
cabinet start/stop

September 27
wired downstairs

September 26
storage table
electrician came

September 25
garage cleanup
September 24
stand for storage

September 23
Icemaker finish.
tools
fixtures

September 22
Shed mower table

September 21
random house stuff (garage, sewing)

September 20
workshop moved. all crates down
Kenny Died

September 19
cement/window wells done.

September 18
sink finish.

September 17
closet table
sink knobs on.

September 16
closet table
sink part 3

September 15
sink
pre-shed shelf

September 14
garage cleanup

September 13
prep sinkwork

September 12
shelf

September 11
faucet part 2

September 10
nothing

September 9
stairs. slight try.

September 8
cementing part 2
sink faucet downstairs
me boxes down

September 7
painting

September 6
cementing

September 5
sink came

September 4
Curtins

September 3
hotwater heater

September 2
curtins stuff. crates down

September 1
kitchen sink
front door
bottom step
prep hotwater/icemaker

August 31
pantry shelves
utility sink purchased

August 30
replaced 20 lightbulbs with cfls

August 29
patched all airholes/spaces with foam

August 28th
patched driveway part 2

August 27th
Waterline finished

August 26
Driveway finished

August 25
Comcast finish

August 24
garage door

August 23
found out no comcast

August 22
Installed doorbell

August 21
ran waterline

August 20
ran cables, wired basement

August 19
Started fishing for comcast lines

August 18
Ed died

August 17
More unpacking

August 16
More unpacking

August 15
Moved in. turned all the heaters off.. not sure why heat was on in every room.
Current Shopping List
• 2 insulated basement windows